Acoustic Flooring for Hotels is an important consideration on any project, whether building a new build Premier Inn or Travelodge or working on the refurbishment of an existing building. JCW Acoustic Flooring have the knowledge and experience required to ensure that even the most difficult project performs to current Building Regulations.

JCW have recently worked on a number of Travelodge Hotels including the Travelodge at Dudley where JCW worked with the Hinton Group. JCW Acoustic Flooring installed Rockwool Rock floor, 19mm Plasterboard Plank and 22mm Chipboard throughout the upper floors. The Acoustic Flooring at the 78-bed Travelodge was installed in March 2017 and April 2017.

JCW Acoustic Flooring have also worked on two Premier Inns at Monmouth and Wells. Knauf Brio 23WF was installed to the 60-bed Premier Inn at Portal Road, Monmouth. Starting on site in August 2016 and completing we completed our works within 4 weeks JCW ensured that the fast paced programme was maintained.

Working nationally JCW Acoustic Flooring install a number of acoustic flooring systems hotels. To discuss the benefits of the above systems and what JCW Acoustic flooring can offer please contact us on 01204 387029 or email us on enquiries@jcwgroup.co.uk.