Aerotel, Heathrow Airport, London

Contractor

ATS Interiors

Architect

5plus Architects

Duration

June 2017 – October 2017


JCW Acoustic Flooring worked with ATS Interiors from June 2017 to October 2017 to deliver the above hotel at Terminal 3 Heathrow Airport. Due to its close proximity to Terminal 3 logistics were key on this project, all materials had to be loaded into the building in the evening to minimise disruption to the airport. JCW Acoustic Flooring installed over 1300m2 of the JCW Acoustic Cradle System at the above project which not only provided a level floor but also enhanced the airborne and impact performance of the separating floors.

Aerotel is situated with Terminal 3 and offers flexible hourly bookings ideal for travellers with long layovers before a connecting flight. The hotel has a library lounge and high quality rooms which include power showers, Wi-Fi and a wake-up call service.e